Sep 20, 2024: 28 rcny § 25-171; & 67 (7)(b) mdl; nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at bulkhead door to roof at fire stairs, 3rd story, section ''93-43''